logo
infrastructure-engineering-and-civil

CHBDC – SH2 Borefield

CHBDC – SH2 Borefield

Contract Value: $800K
Waipukurau SH2

Contact our Infrastructure Engineering team today!

Reece Lloyd

Reece Lloyd

Infrastructure
Manager

E: reece.lloyd@maxtarr.co.nz
M: 027 455 5576

 

Mask Group 13

Nick Reid

Contracts
Manager

E: nick.reid@maxtarr.co.nz
M: 027 324 3114

Mask Group 21

Dylan Buckingham

Project
Engineer

Contact our Industrial team today!

Mask Group 9

Max Tarr

Executive Director

E: max.tarr@maxtarr.co.nz
M: 027 495 2468

Mask Group 8

Jonathan Hogg

Industrial Manager

E: Jonathan.hogg@maxtarr.co.nz
M: 027 444 2054

michael

Michael Hoggard

Project Manager

Contact our Commercial team today!

Dean Berendt

Dean Berendt

Commercial Manager

E: dean.b@maxtarr.co.nz
M: 022 639 3644

andrew

Andrew Tokley

Project Manager
Mask Group 18

Tony Boerboom

Fire & Security Supervisor

E: tony.boerboom@maxtarr.co.nz
M: 027 497 5697

Waipukurau Water System SH2 Borefield Upgrade
Waipukurau Water System SH2 Borefield Upgrade 3 1
Waipukurau Water System SH2 Borefield Upgrade 2 1

Works included the supply of plant, and installation for the expeditious upgrade of the Waipukurau pump station, reinstatement of surfaces and clearing of the site on completion.
Breakdown of works below:

– Supply, fabricate and install pump supports,
– Supply & install of well-caps, seal well heads and construct concrete aprons around well heads;
– Install 3 pumps supplied free issue by CHBDC;
– Supply and install steel pipe work and fittings;
– Supply and install diameter ductile iron valves and fittings;
– Design and construction of thrust and anchor blocks;
– The removal and disposal of existing items as specified on the Drawings;
– Co-ordinate shut down of pump station with the Engineer,
– Connection of new pipeline to the existing 10” AC mainline;
– Design, supply and installation of Electrical Shed extension.