logo
infrastructure-engineering-and-civil

Sanson WW Pumpstation Design & Build

Sanson WW Pumpstation Design & Build

Contract Value: $2.7M
Sanson

Contact our Infrastructure Engineering team today!

Reece Lloyd

Reece Lloyd

Infrastructure
Manager

E: reece.lloyd@maxtarr.co.nz
M: 027 455 5576

 

Mask Group 13

Nick Reid

Contracts
Manager

E: nick.reid@maxtarr.co.nz
M: 027 324 3114

Mask Group 21

Dylan Buckingham

Project
Engineer

Contact our Industrial team today!

Mask Group 9

Max Tarr

Executive Director

E: max.tarr@maxtarr.co.nz
M: 027 495 2468

Mask Group 8

Jonathan Hogg

Industrial Manager

E: Jonathan.hogg@maxtarr.co.nz
M: 027 444 2054

michael

Michael Hoggard

Project Manager

Contact our Commercial team today!

Dean Berendt

Dean Berendt

Commercial Manager

E: dean.b@maxtarr.co.nz
M: 022 639 3644

andrew

Andrew Tokley

Project Manager
Mask Group 18

Tony Boerboom

Fire & Security Supervisor

E: tony.boerboom@maxtarr.co.nz
M: 027 497 5697

20220817MaxTarrPhotos 34
20220817MaxTarrPhotos 35
20220817MaxTarrPhotos 36
20220817MaxTarrPhotos 37
20220817MaxTarrPhotos
20220817MaxTarrPhotos 6
20220817MaxTarrPhotos 40
20220817MaxTarrPhotos 39
20220817MaxTarrPhotos 31
20220817MaxTarrPhotos 26
20220817MaxTarrPhotos 12
20220817MaxTarrPhotos 38
20220817MaxTarrPhotos 11
20220817MaxTarrPhotos 20
20220817MaxTarrPhotos 27
20220817MaxTarrPhotos 10
20220817MaxTarrPhotos 14
20220817MaxTarrPhotos 18
20220817MaxTarrPhotos 3
20220817MaxTarrPhotos 9
20220817MaxTarrPhotos 8
20220817MaxTarrPhotos 7
20220817MaxTarrPhotos 24
20220817MaxTarrPhotos 33
20220817MaxTarrPhotos 32
20220817MaxTarrPhotos 4
20220817MaxTarrPhotos 25

Max Tarr was awarded the detailed design & build contract for the new Sanson wastewater pump station. This pump station will pump wastewater from Sanson and the Ohakea Air base to MDC’s Feilding Wastewater Treatment Plant as part of their Centralisation Programme. The pump station is capable of delivery 38L/s and will ultimately replace the existing Sanson Oxidation Pond.

The wastewater pumping station consists of the following main items:

300m of 225 DNPVC gravity main

Huber screening

Concrete PE lined inlet and wet wells, depth of 8m

Various other concrete chambers for valving & metering

Supply & Installation of 3 x FRP 75,000L storage tanks with wash down systems

Odour control

Pumping equipment including wastewater delivery pumps and wash down water supply pumps

Stainless steel pipework and fittings

Flow meters and instrumentation

Backup Power generation

Electrical supply, fitout & controls

View other projects

1 2 3 11