Waimate & Eltham WTP Upgrade

Waimate & Eltham WTP Upgrade

Contract Value: $660K
STDC Region
  • Contact: Tim Moffit
    06 278 0555

Contact our Infrastructure Engineering team today!

Reece Lloyd

Reece Lloyd

Infrastructure
Manager

E: reece.lloyd@maxtarr.co.nz
M: 027 455 5576

 

Mask Group 13

Nick Reid

Contracts
Manager

E: nick.reid@maxtarr.co.nz
M: 027 324 3114

Mask Group 21

Dylan Buckingham

Project
Engineer

Contact our Industrial team today!

Mask Group 9

Max Tarr

Executive Director

E: max.tarr@maxtarr.co.nz
M: 027 495 2468

Mask Group 8

Jonathan Hogg

Industrial Manager

E: Jonathan.hogg@maxtarr.co.nz
M: 027 444 2054

michael

Michael Hoggard

Project Manager

Contact our Commercial team today!

Dean Berendt

Dean Berendt

Commercial Manager

E: dean.b@maxtarr.co.nz
M: 022 639 3644

andrew

Andrew Tokley

Project Manager
Mask Group 18

Tony Boerboom

Fire & Security Supervisor

E: tony.boerboom@maxtarr.co.nz
M: 027 497 5697

20201007 133534
20201007 133505
20201019 153845
20201019 153817
20200820 093907
20201020 082635
imagejpeg 3
20200528 113737
20200709 165238
pump chamber inside
20201216 093200
20201023 122204
20201023 122137
20201020 083739
20201007 162120
20200911 122220
20200903 131241

This contract scope included upgrades to Waimate & Eltham drinking water supplys for both WTPs in the STDC Region. An overview of the project works is listed below:

  • New 400x450NB Raw water pipework tie-in with new Rapid mixing system & dosing lances
    including new service building to accommodate the rapid mixing unit.
  • Bicarbonate Dosing System & Mixing tank, discharge pump and associated pipework
  • Monitoring & control improvements including Turbidity analysers, sample pumps, PH analyser, Modulating valve actuators & level monitoring.
  • Service water upgrades including new connection from Inaha supply, new suction line to the post reservoir sample pumps, as well as new sample pumps at the reservoir site.
  • New Recycle system & corresponding pipework & level adjustment systems.
  • New Wet well including service grating, pipework connections to existing and new pipework, valving, fittings & submersible Pumpset.
  • Electrical, Instrumentation & controls including New DOL Motor Starter circuits, general lighting for new equipment, New Recycle water pump & VSD, as well as the Configuration & calibration of the instrumentation and integration into the existing NPDC controls system.