PNCC Railway Road Bore WTP Design & Build

PNCC Railway Road Bore WTP Design & Build

Contract Value: $430K
Corner of Railway Road & Roberts Line

Contact our Infrastructure Engineering team today!

Reece Lloyd

Reece Lloyd

Infrastructure
Manager

E: reece.lloyd@maxtarr.co.nz
M: 027 455 5576

 

Mask Group 13

Nick Reid

Contracts
Manager

E: nick.reid@maxtarr.co.nz
M: 027 324 3114

Mask Group 21

Dylan Buckingham

Project
Engineer

Contact our Industrial team today!

Mask Group 9

Max Tarr

Executive Director

E: max.tarr@maxtarr.co.nz
M: 027 495 2468

Mask Group 8

Jonathan Hogg

Industrial Manager

E: Jonathan.hogg@maxtarr.co.nz
M: 027 444 2054

michael

Michael Hoggard

Project Manager

Contact our Commercial team today!

Dean Berendt

Dean Berendt

Commercial Manager

E: dean.b@maxtarr.co.nz
M: 022 639 3644

andrew

Andrew Tokley

Project Manager
Mask Group 18

Tony Boerboom

Fire & Security Supervisor

E: tony.boerboom@maxtarr.co.nz
M: 027 497 5697

Railway Road Controls Aanalysers
Pump Installation
HFA Lift Rig 001
20220204 010700178 iOS
20220204 010653941 iOS
20220204 010419132 iOS

The first is a design & build contract for the chemical dosing of the reservoir which includes a chemical dosing building. A separate HFA and Chlorine dosing systems complete with reservoir diffuser systems for both CL and HFA as well as their respective reservoir connections. Chemical systems supplied by Chemfeed, installed by MTI. Currently chemical dosing systems have been supplied and are ready to be installed once the buildings are completed. Works on site are expected be completed by July for MTI.

The other contract is for the pumpstation which we are a subcontractor to Maycroft. Which includes 450NB inlet pipework, 3x free issue retic pumps (with future allowance for a 4th), S/S internal manifold with a 300NB outlet to a blue-tick calibrated flow meter and connection to existing network reticulation. Currently we have installed the cast in pipework and the building is currently being constructed. The remainder of the installation & commissioning will take place in June/July. HFA dosing skid, ready to be installed at Railway Road.