Install of a New Main Switchboard, 48 meters in length with two separate transformer supplies and two separate generator supplies. Involves the following works:
Install of a New Main Switchboard, 48 meters in length with two separate transformer supplies and two separate generator supplies
Power control and monitoring systems along with SCADA installation for operation and viewing along with generator control and sync for four generator sets
Install of 24x single core 400mm mains cables from new substation to Main Switchboard and terminations
Joining of multiple generator supply cables and relocation to new Switchboard
Planning and implementation to enable the de energizing removal, relocation and extension of 125+ submain cables servicing the live operating hospital site.
Supplies included sensitive areas such as ICU, Theaters and ward locations
All works undertaking while in an functional hospital environment