Max Tarr completed a new UV & irrigation Building at the Greytown Waste Water Treatment Plant for South Wairarapa District Council.
Max Tarr sub-contracted to WaterForce (Head Contractor) to Design, supply and install the WTP building & inlet structure Which included the following components:
Temporary Containerised UV system, to operate during the upgrade process, Geotech survey & report.
New WWTP building, complete with 2x Lift pumps, 2x UV units, 2x Amiad filtration units,
2x Flow meters, wet wells, weir plates, Treadplate covers as well as a variety of Stainless steel manifolds & supports ranging between 150NB – 300NB.
New Inlet Structure & Waste-Water pond connection/tie-in complete with 400NB Isolation Valve extension spindle, 2x sump pumps, accessways & working platform, handrails, Inlet Screen, 150NB S/S riser pipework with 300NB Header Manifold.
Electrical Design, supply & implementation including VSDs, Controls, SCADA & Telemetry that ties in with the Existing SWDC system.