logo
infrastructure-engineering-and-civil

CHBDC Run to Waste

CHBDC Run to Waste

Contract Value: 325K
Central Hawkes Bay

Contact our Infrastructure Engineering team today!

Reece Lloyd

Reece Lloyd

Infrastructure
Manager

E: reece.lloyd@maxtarr.co.nz
M: 027 455 5576

 

Mask Group 13

Nick Reid

Contracts
Manager

E: nick.reid@maxtarr.co.nz
M: 027 324 3114

Mask Group 21

Dylan Buckingham

Project
Engineer

Contact our Industrial team today!

Mask Group 9

Max Tarr

Executive Director

E: max.tarr@maxtarr.co.nz
M: 027 495 2468

Mask Group 8

Jonathan Hogg

Industrial Manager

E: Jonathan.hogg@maxtarr.co.nz
M: 027 444 2054

michael

Michael Hoggard

Project Manager

Contact our Commercial team today!

Dean Berendt

Dean Berendt

Commercial Manager

E: dean.b@maxtarr.co.nz
M: 022 639 3644

andrew

Andrew Tokley

Project Manager
Mask Group 18

Tony Boerboom

Fire & Security Supervisor

E: tony.boerboom@maxtarr.co.nz
M: 027 497 5697

20211021 132700
CHBDC drain to waste MAXTARR AS BUILT
20211018 105107
20211021 132141
TMP Truck Delivery access
20211111 151229
20211112 094143
Scan 2021 10 28 16 32 47
20211112 143959
20211112 114007
20211018 102342
20211013 144725

Max Tarr was engaged by the CHBDC to carry out an upgrade on their existing SH2 borefield; introducing a Run to waste system to allow the bores on start-up to dispense water to waste rather than directly into the reservoir. On the bores start-up there are typically water quality issues. This new system enables CHBDC to draw a more consistent product from their bores.

The work comprises the following components:

  • New S/S Pipe manifolds above ground to connect to their existing bore pipework.
  • New Drainage 180PE Pipe network connecting to overflow chamber, EF Connections
  • Directional Drilling through stop-bank,
  • Discharge outlet Chamber
  • Actuated valves, air relief valves, controls & integration into SCADA network.

View other projects

1 2 3 11