CHBDC engaged Max Tarr to carry out the Removal of the existing Bore pump B at SH2 Waipukurau. This was carried out with the use of a 60T Crane, and a supporting Hiab to remove & disassemble the bore pipework. Once the Bore pump was removed it was transported to our workshop and stripped and assessed. Findings were reported to CHBDC, After some refurbishment works the pump was returned to site and reinstated.